Dual-Fuel Power Station, Liberville, Gabon 70MW
| Power |
70MW |
| Location |
Liberville, Gabon |
| Partnership |
Telemenia
|
| Period |
Jan / Feb – 2012 |
CIVIL
- 1.6 km access road planned and built to handle extremely heavy loads
- 600 m internal service roads
- Site clearing and leveling
- Erection of a 600 m2 administration building
- Erection of a 2,000 m2 power house building
- Walls, cable trenches, tank farm, generator bases, radiator array, piping
MECHANICAL
- Fuel unloading station
- PRMS for reducing gas pressure from 20 bar to 6 bar, 20,000 m3 per hour
- Sewage treatment system
- Cooling system
- Exhaust stacks
- Mechanical installation of all equipment in the station
ELECTRICAL
- 90 MVA substation from 138 kV to 90 kV
- Electrical installation for the entire station
- Control system
- MCC
- Synchronization system
ENVIRONMENT
- Collection of all liquids, separation of water, oil, sewage
- Monitoring of engine emissions to ensure TA-Luft 2002 compliance
- Strict adherence to noise standards
- Strict compliance with WorldBank regulations