Case Studies » Dual-Fuel Power Station, Liberville, Gabon 70MW

Dual-Fuel Power Station, Liberville, Gabon 70MW

Power 70MW
Location Liberville, Gabon
Partnership Telemenia
Period Jan / Feb – 2012

Dual-Fuel Power Station, Liberville, Gabon 70MW

Dual-Fuel Power Station, Liberville, Gabon 70MW

Dual-Fuel Power Station, Liberville, Gabon 70MW
Dual-Fuel Power Station, Liberville, Gabon 70MW
Dual-Fuel Power Station, Liberville, Gabon 70MW
Dual-Fuel Power Station, Liberville, Gabon 70MW

CIVIL

  • 1.6 km access road planned and built to handle extremely heavy loads
  • 600 m internal service roads
  • Site clearing and leveling
  • Erection of a 600 m2 administration building
  • Erection of a 2,000 m2 power house building
  • Walls, cable trenches, tank farm, generator bases, radiator array, piping

MECHANICAL

  • Fuel unloading station
  • PRMS for reducing gas pressure from 20 bar to 6 bar, 20,000 m3 per hour
  • Sewage treatment system
  • Cooling system
  • Exhaust stacks
  • Mechanical installation of all equipment in the station

ELECTRICAL

  • 90 MVA substation from 138 kV to 90 kV
  • Electrical installation for the entire station
  • Control system
  • MCC
  • Synchronization system

ENVIRONMENT

  • Collection of all liquids, separation of water, oil, sewage
  • Monitoring of engine emissions to ensure TA-Luft 2002 compliance
  • Strict adherence to noise standards
  • Strict compliance with WorldBank regulations